Boston Kitchen
FAILTuesday, April 22, 2014 at 5:47 PM
Violations Cited
03-3-501.16
Hot Holding
Chicken in hot holding case @ 120f ensure proper hot hold of 140f or above
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Maintain all hot TCS foods at 135°F or above; Cannot use hot holding equipment to reheat
08-3-305-307.11
Food Protection
1) sauce stored in #10 can store in food grade container once open 2) food sitiing next to ware washing area exposed to employee washing dirty equipment provide proper food protection.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
spray arm at 3 bay sink leaking repair
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-201.11
Walls/Ceilings Designed Constructed Installed
hood sticker expired in March have cleaned by licensed hood cleaning company
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, washable surfaces; No holes or damage; Light-colored in food areas; Clean condition
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
hood above fryers with grease build up clean to remove
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones