Boston Park Plaza (Main Kitchen/Room Serv.)
FAILWednesday, March 15, 2017 at 12:58 PM
Violations Cited
12-2-401.11-.12
Good Hygienic Practices
Observed employee at cookline eating with hans/ no glove use Review procedures with employee to prevent contamination from hands
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Serving boards used for pizzas and cutting boards with soils and heavily scored- Replace
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-204.112/.115
Equipment Thermometers
Rinse guage on high temperature dishwasher fluctuating between 160F-198F. Ensure rinse temperature maintained at 180F-194F. Thermal strips used to indicate machine properly sanitizing
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Ceiling outside of walkins damaged and cracked- Make proper repairs
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones