DING HO FAST FOOD
FAILWednesday, May 29, 2019 at 5:22 PM
Violations Cited
12-3--301.11
Prevention of Contamination from Hands
Employee handling ready to eat foods with bare hands discontinue and use gloves when handling ready to eat foods
Why This Matters
Inadequate handwashing is a leading cause of foodborne illness transmission
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
23-4-602.13
Non-Food Contact Surfaces Clean
1) Shelving along bottom of back wall with spills and soils clean to remove 2) Exterior of rice cooker on bottom shelf with soils clean to remove
Why This Matters
INDIRECT CONTAMINATION: Dirty surfaces attract pests, harbor bacteria, and contaminate via contact or air movement. Dust from dirty shelves contains allergens affecting 32 million Americans. Grease accumulation creates slip hazards causing 25% of restaurant injuries.
Code Requirements
Non-food contact surfaces must be cleaned at frequency to prevent: Soil accumulation; Pest attraction; Contamination of food/food contact surfaces. Includes: Equipment exteriors; Shelving; Walls and ceilings; Light fixtures; Ventilation systems.
Corrective Actions
Deep clean all non-food contact surfaces; Create cleaning schedule with daily, weekly, monthly tasks; Assign cleaning zones to staff; Use degreaser for grease accumulation; Clean from top to bottom; Maintain cleaning log
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
1) Wall to right of cooking area with spills clean to remove 2 Top area and hood vents of cooking line with grease build up clean to remove
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones