Emmanuel College (Muddy River Cafe)
FAILFriday, September 21, 2018 at 7:16 PM
Violations Cited
01-3-602.11 B2
Labeling of Ingredients
Multiple baked products out for self service in packages with no ingridient labels- Provide
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food labeling procedures. Train all staff. Document corrective actions taken.
03-3-501.16
Hot Holding
Macaroni and cheese served in paper cups and hot holding at 128F. Ensure products are maintained at 140F or above- Discarded
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Maintain all hot TCS foods at 135°F or above; Cannot use hot holding equipment to reheat
14-4-202.11
Food Contact Surfaces Design
Multiple cutting boards with heavy scoring and black mold like buildup- Replace
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Refrigeration at pizza station at 48F- Repair
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Door to back area with peeling paint- Repair Window sills above 3 bay sink with peeling paint- Repair
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones