GOURMET INDIA
FAILTuesday, January 22, 2013 at 4:43 PM
Violations Cited
02-3-602.11-.12/3-302.12
Food Container Labels
Bulk food contains not labeled
Why This Matters
Improper labeling can lead to using wrong or expired ingredients
Code Requirements
Immediate correction required. Follow health code section . Implement proper food labeling procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
Food items stored in cabinet under hand sink
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Remove all milk crates
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
33-5-501.13-.17
Adequate Number Frequency Vermin Proof
Provide covers for all waste receptacles
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Ceiling pipes vents and attachments discolored and dusty.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones