Lincoln Bar & Grill
PASSThursday, September 29, 2016 at 4:13 PM
Violations Cited
08-3-302.11/3-304.11
Separation Segregation Cross Contamination
Observed Raw protein products stored above ready to eat items.in prep area reach in unit.Maintain a proper separation of raw and ready to eat items during storage. PIC corrected during inspection. Reviewed storage procedures with PIC.
Why This Matters
Cross-contamination can spread dangerous pathogens throughout the facility
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-302.14
Test Kit Provided
Quats test kit damaged.Provide ne Quats test kit. Sanitizer test was performed with inspectors kit.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
Provide proper sanitizer solution in all cooking/prep areas.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood sticker set to expire 9.17.16.PIC states he has an appointment for 9.22.16. Provide proper cleaning from a licensed company.Post new sticker with proper expiration date. Clean all hood filters to remove dust build up
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones