MARRIOTT/COPLEY PL. CHAMPION'S
FAILMonday, September 19, 2016 at 5:21 PM
Violations Cited
03-3-501.16
Hot Holding
Chicken sausage 105F.Maintain all hot holding 140F or above. PIC removed and discarded product
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Maintain all hot TCS foods at 135°F or above; Cannot use hot holding equipment to reheat
15-4-202.16
Non-Food Contact Surfaces
Excess ice build up in reach in ice cream freezer.Clean to remove.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Observed leaking soda machine under the servicae area sink.Clean to remove spill.Repair. PIC called for service.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood sticker #3 has expired.Provide proper cleaning from a licensed company.Post new sticker with proper expiration date. Clean all filters to remove grease build up.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones