MASS ART DINING COMMONS
PASS W/ CONDITIONSTuesday, February 5, 2013 at 7:14 PM
Violations Cited
04-3-501.15/4-301.11
Inadequate Facilities/Cooling Methods
Provide proper volume of refrigeration and freezer volume at this area.Presently there is a tall boy fridge which contains back up items for the grill which is inoperable replace this volume of refrigeration at this location.There is also a sandwich/salad unit inoperable which needs to feed ready to go grill items and a tall boy freezer which is inoperable which should contain the fries at slacking etc. With this volume of refrigeration and freezer capacity gone from the front line cooks are forced to go back to the walk in in rear to get supplies. Replace volme of all units.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
replace any missing or torn air curtain to cover entire door
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
remove grout stained with black substance clean wall and crevice and replace with new grout
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones