NEW ENGLAND BAPTIST
PASSMonday, April 25, 2011 at 2:22 PM
Violations Cited
M-2-102.11
PIC Knowledge
provide food allergen certificate - asap
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
clean floor under behind and between all equipment and shelves through-out all cooking areas and prep areas (upstairs) clean floor under pot/pan dishwasher and dishwasher clean floor under all men's and women's lockers
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas
36-6-501.11-.12
Improper Maintenance of Floors
repair floor near dishwasher area
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas