Pasta Beach
FAILFriday, March 29, 2013 at 6:30 PM
Violations Cited
41-7-201/04.11
Separation/Sanitizer Criteria
The sanitizer buckets are setup with over 400 ppm quats. Provide the proper sanitizer levels. (corrected by PIC)
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
07-3-306.14
Reservice of PHF or Unwrapped Foods
Parmesan cheese is going to tables in bowls and being reused for other tables. Provide containers that are covered or discard the cheese after it has been on the customer's table.
Why This Matters
This violation supports conditions that may lead to foodborne illness
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
The handsink is adjacent to prep area. Provide separation to prevent contamination. The mopsink in the kitchen is not enclosed. Provide an enclosed mopsink.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
The hood vents are due for a cleaning (the cleaning is already scheduled.) Have the hoods cleaned by a licensed company.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones