Qdoba Mexican Grill
FAILWednesday, January 21, 2009 at 3:39 PM
Violations Cited
41-7-201/04.11
Separation/Sanitizer Criteria
Sanitizer tested in 3rd bay of SinK at a concentration lower than recommended.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
02-3-602.11-.12/3-302.12
Food Container Labels
Generic spray bottle not labeled (limejuice?)
Why This Matters
Improper labeling can lead to using wrong or expired ingredients
Code Requirements
Immediate correction required. Follow health code section . Implement proper food labeling procedures. Train all staff. Document corrective actions taken.
14-4-202.11
Food Contact Surfaces Design
Interior/ exterior of ice Unit dirty. Clean and sanitize at least lx monthly.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
Cloths lying on counters.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Wall behind ice unit and Ceiling vent in Kitchen are dusty.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones