Qdoba Mexican Grill
FAILWednesday, April 15, 2009 at 2:41 PM
Violations Cited
08-3-305-307.11
Food Protection
Review processes. Remember HACCP for Food products.Steak below 140 F and Staff stated product is covered And placed into Warmer.Wrong process! If temperature falls below 140F during production it must be reheated to 165 F.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
16-4-501.11/.15
Dishwashng Facilities
Sanitized (Clean) Side of 3 bay sinK Visibly Soiled.Pans Stacked Soaking Wet. Properly Air Dry. Sanitizing Solution less than recommended usage.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Hot water to hand Sink at 3 bay SinK- temp 'd at 94F. All other sinKs temp'd over 11O F. Provide a Minimum of 110 F.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Wall behind ice unit And side of ice unit dirty And poster worn.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones