Sobrino Market
PASSMonday, March 11, 2013 at 5:00 PM
Violations Cited
01-3-101/701.11
Spoilage Unsafe Food
Two packages of pork sausage with vegetables with a sell by date of 2-14. Both packages were puffed up and PIC removed and discarded.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
Multiple dented cans on retail shelves. Remove and segragate for quick sale. Monitor. Cans and packages of Red Bull stored on floor in meat department. Discontinue and store 6 inches off the floor.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
23-4-602.13
Non-Food Contact Surfaces Clean
Tracks and glass doors on meats chest soiled with food and grime. Exterior of meat chest soiled. Clean to remove. Shelves for vegetables soiled with dust grime and food. Clean to remove. Hot holding unit for beef patties soiled with dried on food. Clean to remove.
Why This Matters
INDIRECT CONTAMINATION: Dirty surfaces attract pests, harbor bacteria, and contaminate via contact or air movement. Dust from dirty shelves contains allergens affecting 32 million Americans. Grease accumulation creates slip hazards causing 25% of restaurant injuries.
Code Requirements
Non-food contact surfaces must be cleaned at frequency to prevent: Soil accumulation; Pest attraction; Contamination of food/food contact surfaces. Includes: Equipment exteriors; Shelving; Walls and ceilings; Light fixtures; Ventilation systems.
Corrective Actions
Deep clean all non-food contact surfaces; Create cleaning schedule with daily, weekly, monthly tasks; Assign cleaning zones to staff; Use degreaser for grease accumulation; Clean from top to bottom; Maintain cleaning log
29-5-201/02.11
Installed and Maintained
Small leak from white pipe in hallway to basement. Repair
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
Floors under and around vegetable display and end caps displays soiled with dust and grime.Clean.
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Ceiling in multiple spots falling and stained. Replace or replace.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones