🚨 Recent Restaurant Closures 🚨

Ueno Sushi

FAIL

Tuesday, April 17, 2012 at 6:34 PM

Address
1 FANEUIL HALL MKT PL PL
North End, MA 02109
Category
FT
Violations
4 total
⚠️ 2 critical
Facility History
58 inspections
18 failures

Violations Cited

⚠️ CRITICAL M-2-201.11/.14 .15
✓ Corrected

Non-Compliance w/Employee Health Policy

Employees onsite cannot explain employee illness policy

Why This Matters

This violation directly contributes to foodborne illness risk

Code Requirements

Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.

⚠️ CRITICAL M-3-603.11

Consumer Advisories

Missing disclosure on consumer advisory

Why This Matters

This violation directly contributes to foodborne illness risk

Code Requirements

Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.

• MINOR 15-4-202.16
✓ Corrected

Non-Food Contact Surfaces

Resurface shelving

Why This Matters

This violation affects overall sanitation and food safety

Code Requirements

Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 15.4.202
• MINOR 37-6-501.11-.12

Improper Maintenance of Walls/Ceilings

Discolored ceiling & fixtures. Dusty ceiling pipes vents light fixtures.

Why This Matters

OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.

Code Requirements

Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.

Corrective Actions

Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones

Mass. Code: 105 CMR 590.006(B) | FDA Code: Section 6-501.11, 6-501.12
View Facility Profile →
Data sourced directly from Boston Inspectional Services Department